How Nadu blowing machine off right

Debon blowing machine properly shutdown process:
One should first turn off the power switch corona processor.
2 die, the body of the heater switch off.
3 at low speed of each extruder so that the extruder and the die to cool slowly.
After four temperature control table until each temperature drops below 135 ℃, and then stopped extruder, turn off the traction and rolling down the switch. Off the power switch, switches off the compressed air.
The film received five reel removed, weighing, packaging and storage.
6 clean up all the leftover material extruders, the health ground, equipment cleaned.
Blowing off properly can extend the life of the machine, can not be ignored!